| 1. | Painting the walls is the predecessor task for hanging the clocks “粉刷墙壁”就是“悬挂钟表”的前置任务。 |
| 2. | Predecessor tasks might not finish before a constrained task starts 譬如,受限制的任务如期开始时,其前置任务因故无法按时完成。 |
| 3. | Starting a task as soon as its links with predecessor tasks , if any , allow 如果链接有前置任务,使本任务在它之后尽可能早地开始。 |
| 4. | Instead , it remains firmly anchored to its specified start date while predecessor tasks move . . 相反地,即使其前置任务有所移动,它仍稳定地保持指定的开始日期。 |
| 5. | A task with an inflexible constraint does n ' t move , even if predecessor tasks finish later than planned 即使其前置任务晚于规划完成,有非弹性限制的任务也不会移动。 |
| 6. | A task that must start or finish before another task can begin is called a predecessor task 如果某一任务必须在另一任务开始之前开始或完成,则此任务称为“前置任务” 。 |
| 7. | You can express lead or lag time as units of time or as a percentage of the predecessor task ' s duration 可以使用时间单位或前置任务工期的百分比来表示前置重叠时间或延隔时间。 |
| 8. | * * * but sometimes the work on a successor task can begin before its predecessor task is entirely finished 但有时后续任务中的工作也可在其前置任务完全结束之前开始,也就是工作可以重叠。 |
| 9. | With lead time , you can overlap two tasks so that a successor task starts before the predecessor task finishes 使用前置重叠时间可以将两任务重叠,从而后续任务将在前置任务完成之前开始。 |
| 10. | 5 . position the pointer over the gantt bar for the predecessor task and drag to the successor task in the other project 5 .将指针指向甘特图中某条形图的前置任务,并拖动到另一项目的后续任务位置。 |